Capital
Projects

Cleveland Avenue and Metropolitan Parkway Arterial Rapid Transit (ART)

MARTA_ARTProgram_TypicalStation View B_01.19.2024_V2_Narrow CROPPED
Image Description: The rendering above shows a proposed bus stop for Cleveland Avenue and Metropolitan Parkway Arterial Rapid Transit (ART). The enlarged structure shelters customers from the elements and includes real-time arrival signage, a concrete pad, trash and recycling receptacles, bike racks, and solar panels where applicable.

Current Status

Final design complete. Currently in procurement. Construction scheduled to begin in Fall 2025.     

Project Overview:  

MARTA, in collaboration with the City of Atlanta through the More MARTA program, is investing in Arterial Rapid Transit (ART) in the Cleveland Avenue and Metropolitan Parkway corridors. This will provide fast, frequent, and reliable service with upgraded station amenities designed to enhance the rider experience.   

  • These investments are being made to improve connectivity, accessibility, and mobility in this high-ridership area.    
  • The corridors serve the East Point and West End rail stations and are home to 70% of riders who are transit dependent.   
  • Key destinations include Atlanta Technical College, Atlanta Metropolitan State College, Citi Center Shopping Center, Wellstar Atlanta Medical Center South, and the Atlanta BeltLine.  
Cleveland Met ART Map with Stops
Image Description: The image above shows a map of the proposed Metropolitan and Cleveland ART routes with stops and bus transfer points. The map also includes major points of interest including the MET, WellStar Medical Center, and grocery stores. Both ARTs connect to Red/Gold Lines with Metropolitain ART servicing West End Station in the north and Cleveland ART servicing East Point Station in the south. 

Timeline 

  • August 2023: Design Complete
  • September 2023: MARTA issues an invitation to bid on construction of the project.  
  • November 2023: One bid response received, but it is deemed non-responsive. 
  • January 2024: MARTA and City of Atlanta regroup to add additional sidewalk improvements to the project, in order to make the project more attractive to bidders. As a result, this project’s construction start date has been pushed out from Fall 2023. 
  • Fall 2025: Planned construction start date. 

Resources/Documents 

Industry Day 2023 (for contractors)  

Public Meeting Video 

2022 Meeting Documents  

2020 Meeting Documents  

traffic-cleveland
Image Description: The image above shows renderings of the proposed, protected crosswalks complete with accessible ramps, flashing signals, and new concrete pads at the intersection of Cleveland Avenue and Elsinore Street.

Stay Informed  

Please submit comments regarding the project via email to:  
Joshua Pisani 
Project Manager II
jpisani-ctr@itsmarta.com  

Back to top